Speed dating bellingham searching for free dating sites

The RI/FS, Cleanup Action Plan (CAP), and Consent Decree (CD) for this site are complete.

An Engineering Design Report (EDR) is expected to be released in 2016 for public review. The property is currently owned by the county and managed as part of the park by the city.

By educating yourself on the history, contamination, and cleanup processes for the Bellingham Bay Waterfront, you can keep up to speed and participate in the pubic process to ensure the cleanups for these sites are the best possible under state law .

Learn more about the cleanup process [insert link] and find out more on each of the cleanup sites.

An RI/FS was completed in 2014, and the preferred site-wide cleanup alternative includes removal of petroleum product floating on the groundwater and containment of contaminated soil.

Public review of the Consent Decree or amended Agreed Order, with a Cleanup Action Plan is scheduled for early 2016. This 200-acre site, including an industrial waste treatment lagoon, is associated with the former GP pulp and paper plant operations.

The CAP and CD or amended Agreed Order are expected to be out for public review early in 2016. This site comprises 21 acres of parkland on Bellingham’s northeast waterfront, including Little Squalicum Creek, an independent drainage running through the park, fed by spring water and stormwater runoff.

Portions of this park were contaminated, in part, by past operations at the Oeser Co., which is an active wood treating business located next to the park.

In 2004, an interim action removed contaminated sediment from the site as part of port redevelopment activities.Site contaminants include pentachlorophenol (PCP), hydrocarbons related to diesel fuel, dioxins, furans, and polycyclic aromatic hydrocarbons (PAHs).An interim cleanup took place in 2013 to contain oil seeping from the shoreline in an area of the site.An interim action that removed petroleum-contaminated soil from a portion of the site was completed in 2013.A Remedial Investigation/Feasibility Study (RI/FS), is due to be released for public review in early 2016. This cleanup site is located on the Bellingham waterfront between Boulevard Park and the former Georgia-Pacific pulp mill.

Search for speed dating bellingham:

speed dating bellingham-26

The CD includes requirements for groundwater monitoring, and use restrictions to prevent disturbance of remaining limited areas of buried contaminated soil. This cleanup site, now owned by the port, includes about 74 acres on the Bellingham waterfront, and was used to manufacture paper products from 1925 through 2007.

Leave a Reply

Your email address will not be published. Required fields are marked *

One thought on “speed dating bellingham”

  1. Of course, the target of these strikes is not Egypt or its military. The jihadist horde has managed to set up a fairly significant base of operations in the Sinai Peninsula, which, with the fall of the Caliphate in Iraq and Syria, is now the major ISIS stronghold in the region.